Brutalist — Complex Layouts

COMPLEX / COMPOSED

Σύνθετα brutalist sections για τη Sthenos AI βιβλιοθήκη: bento grids, ops dashboard, comparison matrix, timeline, collage και mega footer — όλα σε λευκό + navy. Χρειάζονται το Helper CSS [51] (και προαιρετικά το [42] του βασικού brutalist pack για tags/press buttons).

// LIGHT · BRUTAL · CSS GRID INSIDE DIVI · ACCENT #1e3a8a

[51] HELPER CSS — COMPLEX — grid/bento, dashboard, πίνακες, timeline, collage, mega footer

// COMPLEX HELPER CSS — ΜΕΤΈΦΕΡΈ ΤΟ ΣΤΟ THEME OPTIONS > CUSTOM CSS ΚΑΙ ΣΒΉΣΕ ΑΥΤΌ ΤΟ MODULE

[52] BENTO GRID — 6 CELLS — ασύμμετρο CSS grid: flagship κελί, inverted KPI, εικόνα, live log, badges

Overview

THE WHOLE SYSTEM. ONE GRID.

FLAGSHIP // C2 CORE

One picture. Every domain. Zero lag.

Short placeholder copy. Replace with your own content — two or three sentences are enough here. Short placeholder copy. Replace with your own content — two or three sentences are enough here.

MARITIMEAIRLANDCYBER
LATENCY

14ms

Sensor to screen, at the edge.

Ops
SYS.LOG

UPTIME99.98%

NODES128/128

MODEAUTONOMOUS

CERTIFIED

STANAG / 4586

NATO interoperability out of the box.

DEPLOYMENTS

240+

Across 12 countries.

[53] OPS DASHBOARD — KPI κελιά, sector map με blips, striped meters και live log με cursor

Live view

WATCHFLOOR, FLATTENED.

ACTIVE TRACKS

1,284

+12% vs last watch

THREATS FLAGGED

7

2 pending operator review

FUSION CONFIDENCE

96%

Rolling 60-minute window

SECTOR MAP // GRID 7
SUBSYSTEM LOAD
ISR FUSION82%
EW ANALYTICS64%
COMMS MESH91%

14:02:11TRACK 0441 RECLASSIFIED → FRIENDLY

14:02:36NODE K-17 REJOINED MESH

14:03:02AWAITING OPERATOR ACK

[54] COMPARISON MATRIX — brutal πίνακας 4 στηλών με highlighted στήλη, YES/NO markers, scroll σε mobile

Versus

US, IN A TABLE.

CAPABILITYSTHENOS AILEGACY C2GENERIC ML STACK
Edge deployment (air-gapped)■ YES✕ NOPartial
Sensor-to-decision latency14ms~400ms1.2s
Multi-domain fusion■ YES■ YES✕ NO
Operator override, always■ YES✕ NO■ YES
NATO STANAG interop■ YESPaid add-on✕ NO
Continuous on-site delivery■ YES✕ NO✕ NO

// DEMO DATA — ΑΝΤΙΚΑΤΈΣΤΗΣΕ ΜΕ ΠΡΑΓΜΑΤΙΚΆ ΣΤΟΙΧΕΊΑ

[55] PROCESS TIMELINE — κάθετη ράγα με αριθμημένα κουτιά, εναλλάξ rotation και stamps εβδομάδων

Rollout

SEVEN WEEKS TO OPERATIONAL.

01
WEEK 0–1

SITE SURVEY & THREAT MODEL

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

02
WEEK 2

EDGE HARDWARE STAGING

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

03
WEEK 3–5

MODEL ADAPTATION ON YOUR DATA

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

04
WEEK 6

OPERATOR TRAINING & DRILLS

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

05
WEEK 7

LIVE EXERCISE → SIGN-OFF

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

[56] COLLAGE FEATURE — 3 επικαλυπτόμενες φωτο-κορνίζες με διαφορετικές offset σκιές + rotated tag

FIELD FOOTAGE // 2026

In the field

PROVEN OUTSIDE THE LAB.

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

Short placeholder copy. Replace with your own content — two or three sentences are enough here.

EXERCISES34 JOINT / 9 NATO

SEA STATEUP TO 6

TEMP RANGE−30° / +55°C

[57] MEGA FOOTER — στήλες με mono links, τεράστιο outlined wordmark, barcode και bottom bar